Ingenieurbüro Jürgen Hölscher  |  References Deutsch  English 
 

Allerheiligen-Hofkirche (Court Church) / Gallery 5
 
The intricate installation of the technical facilities frequently affected existing structures (lowering of floors, coredrillings, breakthroughs, slots). After the interior works are finished hardly anything of this is visible in the church.
 
central ventilation station in the basement
Under the central ventilation station in the basement the floor slab gad to be lowered for about 1,35 m.
A grating platform was installed in middle height.
ventilation ducts
Ventilation ducts in the basement.
joisted concrete slab above the basement
Coredrillings for technical installations in the joists of the existing slab over the foyer in the basement.
electrical installations
Electrical installations in the technical area.
installations in the intermediate floor
Installations in the intermediate floor of
the sacristy wing.
installations in the intermediate floor
Heating, ventilation and plumbing in the intermediate floor of the sacristy wing.
installations on the galleries
Installations on the galleries.
installation shaft
Vertical installation in an existing shaft.

Allerheiligen-Hofkirche  |  gallery 1  |  gallery 2  |  gallery 3  |  gallery 4  |  gallery 5
 
Home  |  © 2003  IB HKM  |  latest update: 04.02.2005  |  eMail