Before the remodelling the basement was very low; therefore the existing ground slab was dismantled and a new slab placed approx. 30 cm deeper.
|
Excavations in the basement; due to lack of space and in order to avoid too strong vibrations in the build- ing only small equipment could be used.
|
Excavations in the basement.
|
By dismantling the ground slab these vaults were un- covered in the foundation level, a structural element that can also be found in other buildings of Klenze.
|
Floor channel for the crossing of the ventilation and electrical ducts beneath the new ground slab.
|
After the new ground slab was finished the placing of the cloakroom and toilet boxes began (steel-timber-constructions).
|
Basement foyer with cloakroom and toilet boxes.
|
cloakroom box in the foyer of the basement.
|